Project Services > Water > Endocrine Disruptor Demonstration Programme, Swindon Endocrine Disruptor Demonstration Programme, Swindon Sewage Treatment Works for Thames Water Utilities The team delivered a designed, installed and commissioned tertiary treatment plant to remove endocrine disruptors, utilising granulated activated carbon (gac) in adsorbed vessels. This project was won competitively through value management and engineering, which delivered a radically modified site layout whilst maintaining the same overall process. The handling and placement of the gac was carefully considered, with detailed methodology and planning. Great Crested Newts were present on the site, so environmental impact mitigation measures were taken at this sensitive location. Procurement Route: I Chem E Burgundy with TW amendments Sector: Wastewater Treatment Value: £8 million |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||