|
|
|
||||||||||
|
|||||||||||
|
|
|
|
Project Services > Civils > Construction Management Framework 3 Construction Management Framework 3: Areas 9 and 10 Concrete Repairs for the Highways Agency Winner of the 2005 Long Term Partnering Award Contract Journal Construction Industry Awards Following the successful CM Pilot 2 framework for temporary works, this award winning framework covers concrete repairs on all purpose trunk roads and motorways in Areas 9 and 10. Within this framework, Interserve Project Services has achieved UKAS accreditation for its on-site concrete cube testing laboratory. Accredited to BS 1881:parts 116 and 114, the laboratory is available for density and compression testing of standard 100mm or 150mm concrete cube sizes - up to a maximum of 2000kN loading. The presence of the laboratory removes the delay of waiting for test results. Instead it allows strength results to be given as and when needed, with the maximum wait only dependent on the curing time of the concrete.
Contracts include:
R117 Wigmore Viaduct R121 Gravelly Hill R125 Ray Hall Viaduct A38 Tame Valley Viaduct & M6 Bromford Viaduct M60 Jct 1 to 2 Concrete Overlay Procurement Route: Collaborative
Sector: Roads
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||